Laserfiche WebLink
DIRECTOR'S REPOIRT <br />ITEM NO: I! <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — Febrpgr <br />jLZO 14 <br />Poyjer <br />Wholesale Load (Vista): <br />Peak Demand: <br />RVSQ Ever gy_t4jLCL@LW1e_jj: <br />ReSQUICe <br />a) <br />Nuclear <br />b) <br />Coal <br />c) <br />Large Hydroelectric <br />d) <br />Natural Gas <br />e) <br />Renewables <br />Other 'BPA) <br />g) <br />Inter SC Trades <br />h) <br />Green Inter SC Trades <br />ill <br />CAI SO Purchases <br />152,823 MWFI (Table 1) <br />288 MW of which 301 MW met by RVSD resources (Table 2 <br />8,734 <br />68,374 <br />2,7515 <br />5. 880 <br />24,642 <br />1,709 <br />8,920 <br />....__._ -152, ' 31, 809 <br />Total: 823 <br />U� Gr e'n pf""vver Su.;pply — <br />aN! e I '�U � 24,642 which yields 16.12% of the Total Wholesale Load Requirement <br />Resource Availabilijy� <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 99,98% capacity factor for the month. <br />Coal: IPP units I and 2 operated at 74,27% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 24 MW, with enemy of 2,755 MWH, <br />gy entitlern <br />Natural Gas: Clear ate availability was 100% for the month. <br />R Station (Units 1,2,3 and 4) availability was 97,32% for the month. <br />Springs units 1, 2, 3 and 4 availability was 99.80% for the month. <br />Renewable: Salton Sea units operated at 75.36% capacity factor for the month, <br />Wintec operated at 111,34% energy factor. <br />WKN operated at 26,54% energy factor. <br />The attached graphical comparisons represents RPU's February: <br />Table 1: Total Energy Requirements/Resource Mix <br />Table 2: Total Weak Hour Capacity <br />Table 3: Retail Customer Load <br />Table 4: Daily Peak Load and Temperature Comparisons <br />AA <br />Attachments <br />cc: Scot, C. Barber, City Manager <br />