Laserfiche WebLink
Vu A I Y I'R F Pd l R 6 Y i t r <br />RIVERSIDE PUBLIC UTILITIES <br />-bag Board • . <br />BOARD OF PUBLIC UTILITIES DATE: January 17, 2014 <br />DIRECTOR'S REPORT <br />ITEM NO: 13 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — November 2013 <br />Power Usage: <br />Wholesale Load (Vista):. — 164,474 MWH (Table 1) <br />Peak Demand: -- 313 MW of which 236 MW met by RVSD resource (Table 2) <br />RVSD Energy Resources (Table 1): <br />Resource <br />a) Nuclear <br />b) Coal <br />c) Large Hydroelectric <br />d) Natural Gas <br />e) Renewables <br />f) Other (BPA) <br />g) Inter SC Trades <br />h) Green Inter SC Trades <br />i) CAISO Purchases <br />5,481 <br />67,796 <br />1,747 <br />347 <br />31,410 <br />1,890 <br />10,000 <br />13,370 <br />32,433 <br />Total: 164,474 <br />Totau it "a,,,:aw n i�lower Suppi y — 44,780 which yields 27.23% of the Total Wholesale Load Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 58.56% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 68.73% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 24 MW, with energy entitlement of 2,569 MWH. <br />Natural Gas: Clearwater's availability was 100% for the month. <br />RERC Station (Units 1,2,3 and 4) availability was 77.53% for the month. <br />Springs units 1, 2, 3 and 4 availability was 97,57% for the month. <br />Renewable: Salton Sea units operated at 91.39% capacity factor for the month. <br />Wintec operated at 22.52% energy factor. <br />WKN operated at 21.46% energy factor. <br />The attached graphical comparisons represents RPU "s November: <br />Table 1: <br />RVSD Energy Resources <br />Table 2: <br />Peak Day Usage of RPU Resources <br />Table 3: <br />Retail Customer Load <br />Table 4: <br />Daily Peak Load and Temperature <br />AA <br />Attachments <br />cc: Scott C. Barber, City Manager <br />