Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
01-17-14
>
01-17-2014 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2015 4:39:16 PM
Creation date
5/29/2015 2:23:55 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Agendas
Document Relationships
01-17-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: January 17, 2014 <br />ITEM NO: 3 <br />SUBJECT: ELECTRICAL EQUIPMENT INSPECTIONS - AREA 9 — WORK ORDER NO. 1409648 <br />ISSUE: <br />The issue for the Board of Public Utilities consideration is approve of operational expenditure of $77,063.90 <br />for Work Order No. 1409648 for the inspection of pad- mounted electrical equipment in Area 9. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve the estimated operational expenditure in the amount of $77,063.90 <br />for Work Order No. 1409648. <br />BACKGROUND: <br />Riverside Public Utilities (RPU) is beginning the second round of detailed inspections for pad- mounted <br />electrical equipment that will include the inspection and assessment of the underground system according to <br />requirements of General Order 128. The inspections will include all the pad- mounted structures and <br />equipment in Area 9. This effort includes the migration of the inspection data into the Asset Management <br />System. The project also includes the addition of newly installed structures and photos of the new equipment <br />for future reference. The Board of Public Utilities approved related Work Order No. 1316015 on November 1,. <br />2013, for underground (subsurface) structure and equipment inspections in Area 9. <br />The inspection portion of this project for pad- mounted electrical equipment was issued to the Contractors' <br />Panel for Energy Delivery for bids on September 5, 2013. Bids were opened on September 19, 2013, and <br />Henkels & McCoy, Inc. was the lowest responsive and responsible bidder in the amount of $54,149. Detailed <br />bid results are provided in the table below: <br />Contractors Panel Member_ Location Bid Amount Comments _ <br />Henkels & MCC o r�_ _ _ _ Pomona, CA $54,149.00 Lowest Responsible Bidder <br />Electric Fontana, CA $65,741.90 <br />International Line Builders Riverside CA $284,512.50 <br />Southern Contracting San Marcos, CA No Bid No Res onse <br />The inspections are due at different time intervals. As a result, the inspections are completed on different <br />work orders. <br />Project Schedule <br />Engineering Performed B: <br />Civil Construction Performed <br />B_ <br />Electrical Work Performed B: <br />Antici ated Start Date: <br />Anticipated Duration: <br />Coordination Required With: <br />Reimbursements: <br />RPU Asset Mana ement <br />N/A <br />Contract Crews <br />Monday, Janua 27, 2014 <br />6 weeks <br />RPU Dispatch <br />N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.