Laserfiche WebLink
R)L,q--D E_nerqY_ Mix _CLa_b'e_1).: <br />Resource IAWH <br />a) Nuclear <br />b) Coal <br />c) Large Hydroelectric <br />d) Natural Gas <br />e) Renewables <br />f) Other (BPA) <br />g) Inter SC Trades <br />h) Green Inter SC Trades <br />CAI SO Purchases <br />I <br />------ __'_ 5 - 2,91 - 0 <br />Total : 170,430 <br />G'-'ree .# ? _ p 'P-57b46 �0"V'kffl, which yields 9.18% of the Total Wholesale Load Requirement <br />Resource Availab <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 70-90% capacity factor for the month. <br />Coal: IPA' units I and 2 operated at 31.53"1 capacity factor for the month. <br />Large Hydro: Hoover, VSD's capacity entitlement was 21 MW, with energy entitlement of 4,243 MWH, <br />Natural Gas: Clearwater:s availability was 100% for the month. <br />RERC Units 1, 2, 3 and 4 availability was 98.79% for the month. <br />Springs Units 1, 2, 3 and 4 availability was 100% for the rnonth. <br />Renewable: Salton Sea units operated at 40A4% capacity factor for the month. <br />Wintec operated at 36.72% capacity factor. <br />WKN operated at 44.05% capacity factor. <br />The attached graphical comparisons represents RPU's April: <br />Table 1: Total Energy Requirements/Resource Mix <br />Table 2 :€z Pea Hour Total Capacity <br />I a <br />Table 3: Retail Customer Load <br />Table 4: Daily Peak Load and Temperature Comparisons <br />AA <br />Attachments <br />cc: Scott C. Barber, City Manager <br />