Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
06-06-14
>
06-06-2014 BPU RPT 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:16:01 PM
Creation date
5/28/2015 11:36:41 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
06-06-2014 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
06-20-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
R)L,q--D E_nerqY_ Mix _CLa_b'e_1).: <br />Resource IAWH <br />a) Nuclear <br />b) Coal <br />c) Large Hydroelectric <br />d) Natural Gas <br />e) Renewables <br />f) Other (BPA) <br />g) Inter SC Trades <br />h) Green Inter SC Trades <br />CAI SO Purchases <br />I <br />------ __'_ 5 - 2,91 - 0 <br />Total : 170,430 <br />G'-'ree .# ? _ p 'P-57b46 �0"V'kffl, which yields 9.18% of the Total Wholesale Load Requirement <br />Resource Availab <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 70-90% capacity factor for the month. <br />Coal: IPA' units I and 2 operated at 31.53"1 capacity factor for the month. <br />Large Hydro: Hoover, VSD's capacity entitlement was 21 MW, with energy entitlement of 4,243 MWH, <br />Natural Gas: Clearwater:s availability was 100% for the month. <br />RERC Units 1, 2, 3 and 4 availability was 98.79% for the month. <br />Springs Units 1, 2, 3 and 4 availability was 100% for the rnonth. <br />Renewable: Salton Sea units operated at 40A4% capacity factor for the month. <br />Wintec operated at 36.72% capacity factor. <br />WKN operated at 44.05% capacity factor. <br />The attached graphical comparisons represents RPU's April: <br />Table 1: Total Energy Requirements/Resource Mix <br />Table 2 :€z Pea Hour Total Capacity <br />I a <br />Table 3: Retail Customer Load <br />Table 4: Daily Peak Load and Temperature Comparisons <br />AA <br />Attachments <br />cc: Scott C. Barber, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.