Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
06-06-14
>
06-06-2014 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:20:18 PM
Creation date
5/28/2015 11:33:04 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
06-06-2014 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
06-20-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
'The item for Board of Public Utilities consideration is approval of a capital expenditure in the amount, of <br />$239,735 for Work Order No., 1325480 for the relocation of electric facilities along Cole Avenue from <br />Lurin to Krameria Avenues. <br />That the Board of Public Utilities approve the estimated capital expenditure of $239,735 for Work Order <br />No. 1325480 to relocate electric facilities along Cole Avenue from Lurin to Krameria Avenues for the <br />Cole Avenue Storm Drain improvements Project, a Public Works Department Street Improvements <br />Project. <br />Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br />impacts to the project and surrounding area, with sensitivity of the existing neighborhood and within City <br />Planning guidelines for the designated area of the project. <br />7- <br />Electric <br />Contractor <br />City Location <br />Bid Total <br />Facilities <br />I i Universal Pipeline <br />�_____Menlfee, CA <br />$1,030,241 1 <br />$63,216 <br />-- ----------------------------------- <br />2 Weka, Inc, <br />4 -- - ----- ---------- -------- <br />Highland, CA 1 <br />$1,159.4531 <br />$66,254 <br />--- - --- ----- - ------- — ------- <br />3 Vido Samarzich, Inc. <br />Alta Loma, CA <br />---- - -- <br />$1,278,990 <br />- -------- <br />$5Z 120 <br />-------- - -------- --- -------- --- ------------ ----------- <br />4---' David T sden, Inc. <br />---- --------------- ---- <br />Riverside, CA <br />$1,3556312 S <br />$127,487 <br />- ------- ----- I --------- - -------------- -------- <br />5 3 Gwinco Incorporated ; Ontario CA $1,392,547 1 <br />. .. . ..... . .. . ..... . .. . ..... . .. . ..... <br />$79,972 <br />6 Hemet M Co dba Genesis Construction <br />.......... -- --------- <br />Hernet, CA <br />..... ...... <br />$1,486,777 <br />$127,000 <br />0, Public Work, s Engineers Construction Cost Estimate: $1, 122,623 <br />4- RPU Engineer's Construction Cost Estimate: <br />$63,873 <br />
The URL can be used to link to this page
Your browser does not support the video tag.