Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
11-21-14
>
11-21-14 BPU RPT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:29:12 PM
Creation date
5/27/2015 4:58:26 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
11-21-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
The issues for Board of Public Utilities consideration are: 1) rejection of lowest bid received for Bid N <br />RPU-7259 for pole replacements at various locations throughout the City; and 2) award of Bid No. RPU <br />7259 for pole replacements at various locations throughout the City. 1 <br />F� 111 <br />Reject the bid submitted by Klondyke ! • of Phoe • the amount of <br />$824,475.00, as non-responsive; and <br />Award Bid No. RPU-7259 to the lowest responsive bidder, International Line Builders,,, Inc., of <br />Riverside, California, in the amount of $1,187,863-01. <br />[ = T:T01 X O� T�Z1 <br />Riverside Public 11tilities (RPU) performs inspections of its electric distribution system as standarli <br />maintenance. Given the large quantity of work, and the desire for the best possible contractor pricini <br />the Electric Field Manager selected a group of 85 poles, engineering for replacement, to be combineo <br />into one project formal bidding. 1 • r i ■; issued on August <br />due date of October 3, 2014. 1 <br />11111 iq� -• - - • 0 <br />Klondyke Construction LLC was deemed non-responsive by the Purchasing Services Manager becaus'.1w <br />they did not meet the minimum licensed experience requirement identified in the bid specification. Th(; <br />second lowest bidder, International Line Builders, Inc. was deemed responsive. <br />Contractor <br />! <br />■ : Total <br />International Line Builders, Inc. <br />Riverside, CA <br />$1,187,863.017 <br />Rokstad Power, Inc. <br />San Die, o, CA <br />$1 199,219.60 <br />1 1 1992 19. 60 <br />1; <br />Asplundh Constructin ! Co <br />I - ........... <br />Bea <br />•1' <br />1� <br />w & !` <br />................ .............. ............ ............ ............. . ........... ................. <br />,1 <br />Klondyke Construction LLC was deemed non-responsive by the Purchasing Services Manager becaus'.1w <br />they did not meet the minimum licensed experience requirement identified in the bid specification. Th(; <br />second lowest bidder, International Line Builders, Inc. was deemed responsive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.