Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
11-21-14
>
11-21-14 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:29:55 PM
Creation date
5/27/2015 4:53:09 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
11-21-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
BOARD OF PUBLIC UTILITIES DATE: NOVEMBER 21,2014 <br />ITEM NO: 6 <br />SUBJECT: UNDERGROUND VAULT REPLACEMENT - WORK ORDER NO. 1505427 <br />1000006 <br />0 <br />Riverside Public Utilities (RPU) performs inspections of Its electric distribution system as standard <br />maintenance. Staff identified the deterioration of underground vault V-1836 during an inspection,,, <br />46 <br />Underground concrete vaults are difficult to repa , ir because they normally contain energized electric <br />equipment. The equipment in V-1836, located at the intersection of Tyler St. and Mandalay Ct., has <br />been removed in preparation for the proposed work to replace the vault., <br />Riverside Public4itilities engineering staff performed the design to eliminate any negative visual 'Impacts <br />to the project and surrounding area, with sensitiVity of the existing neighborhood, and within City <br />Planning guidelines for the designated area of the project. <br />p iq�11111111111q 11111111 11111 <br />0 1 . . ..... o je , cibie- -a' , , " - k ..... . . .. . ............ d .......... . .... . . . .... o ............. . .... . . . w,`_n <br />RPU engineering statV <br />. . ........ ........ 0016---mul <br />Civil Construction Performed By: <br />ergy Delivery Contractors' Panel <br />Electrical Work Performeq_py: RPU field forces <br />��nticip;ged Start Date: <br />!j December, 2014 <br />. ......... ___ <br />Anticipated Duration: � 3 weeks <br />. .......... <br />b-60--rdinati—on R—equired With: PW Inspector, RPU Inspector and RPU Field Superintendent <br />.................................. I ................. . ..... . . . . . .. .. .. .. . . ....... . ...................... . . ........ . . ...................................... . ........ <br />Reiinburse lei` %ts: <br />The capital expenditure for Work Order No. 1505427 is estimated to be $213,000 as summarized in the <br />following table: <br />
The URL can be used to link to this page
Your browser does not support the video tag.