Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2014 BPU
>
11-21-14
>
11-21-14 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 9:32:06 PM
Creation date
5/27/2015 4:46:31 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
11-21-2014 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2014 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
-3 rat""I <br />fj <br />Board Memorandum <br />"MI <br />BOARD OF PUBLIC UTILITIES DATE,: NOVEMBER 21, 2014 <br />ITEM NO: 4 <br />SUBJECT: UNDERGROUND SWITCH REPLACEMENT— WORK ORDER NO. 1502322 <br />Riverside Public Utilities (RPU) performs inspections of its electric distribution system as standard <br />maintenance. Staff identified the detedoration of underground vault V-2063 during an 'inspection,, <br />Deterioration of underground concrete vaults 'is difficult to repair because of the energized equipment <br />they contain. This vault contains an energized switch, transformer and other switching equipment that <br />serve electric customers in the area. <br />Prior to the replacement of this vault, located near the intersection of Adams Street and Lincoln A enue <br />I <br />the equipment inside must be removed. This work order includes the installation of approximate y 16 <br />trench feet of conduit and cable, the installation of two pad mounted structures and related electri <br />facilities to facilitate removal of the equipment within the vault,, Once this is completed, staff will enginee <br />and seek approval to actually replace the vault under a separate work order. <br />RPU engineering staff performed the design to eliminate any negative visual 'impacts to the project and <br />surrounding area, with sensitivity of the existing neighborhood, and within City Planning guidelines for the <br />designated area of the project. <br />11 11 111 'plir <br />�7-M. ii:'' ��� liiiiilll 111111 1 1P1t03"s7r`1!! :111!11171111[1 <br />� ;J I_$J L:-Iq a ---= Tv ■ <br />MITG� <br />
The URL can be used to link to this page
Your browser does not support the video tag.