Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2015 BPU
>
03-05-15
>
03-05-15 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2015 11:03:09 AM
Creation date
5/22/2015 11:03:01 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
03-05-2015 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2015 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E H E R 6 L ] i - <br /> RIVERSIDE PUBLIC UTILITIES <br /> AW& Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: MARCH 5, 2015 <br /> ITEM NO: 5 <br /> SUBJECT: UNDERGROUND ELECTRICAL INSTALLATION NEAR FOURTEENTH STREET <br /> AND BROCKTON AVENUE FOR THE RIVERSIDE COMMUNITY HOSPITAL <br /> EXPANSION PROJECT-WORK ORDER NO. 1503841 <br /> ISSUE: <br /> The issue for Board of Public Utilities consideration is approval of a capital expenditure of $115,000 for <br /> Work Order No. 1503841 for the installation of electrical distribution facilities for the Riverside Community <br /> Hospital Expansion Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $115,000 for Work Order <br /> No. 1503841 for the installation of electrical distribution facilities for the Riverside Community Hospital <br /> Expansion Project. <br /> BACKGROUND: <br /> The project will extend existing electrical distribution facilities to serve the Riverside Community Hospital <br /> Tower One Expansion Project. The project includes the installation of approximately 910 trench feet of <br /> conduit, one pad-mounted switch, two pad-mounted transformers, one pad-mounted junction cabinet, <br /> three underground structures and related electrical facilities. <br /> Riverside Public Utilities {RPU} engineering staff performed the design to eliminate any negative visual <br /> impacts to the project and surrounding area, with sensitivity to the existing neighborhood and within City <br /> Planning guidelines for the designated area of the project. <br /> The project breakdown is proposed as follows: <br /> Project Breakdown <br /> Engineering Performed By: RPU engineering staff <br /> Civil Construction Performed By: Developer at developer's expense <br /> Electrical Work Performed By: RPU field forces <br /> Anticipated Start Date: March 15, 2015 <br /> Anticipated Duration: One Year <br /> Coordination Re uired With: Developer <br /> Reimbursements: 100% reimbursable by developer <br />
The URL can be used to link to this page
Your browser does not support the video tag.