Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2015 BPU
>
04-02-15
>
04-02-15 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2015 9:18:58 AM
Creation date
5/22/2015 9:18:51 AM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
04-02-2015 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2015 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N f_ P C B I ? I F <br /> Lo RIVERSIDE PUBLIC UTILITIES <br /> • ' . III& Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: APRIL 2, 2015 <br /> ITEM NO: 6 <br /> SUBJECT: UNDERGROUND ELECTRICAL INSTALLATION NEAR CANYON CREST AND EL <br /> CERRITO DRIVES FOR THE CANYON BLUFFS APARTMENT COMPLEX- WORK <br /> ORDER NO. 1507267 <br /> ISSUE: <br /> The issue for Board of Public Utilities consideration is approval of the capital expenditure of $76,000 for <br /> Work Order No. 1507267 for the installation of electrical distribution facilities for the Canyon Bluffs <br /> Apartment Complex. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $76,000 for Work Order <br /> No. 1507267 for the installation of electrical distribution facilities for the Canyon Bluffs Apartment <br /> Complex. <br /> BACKGROUND: <br /> The project will extend existing electrical distribution facilities to serve 88 units at the new Canyon Bluffs <br /> Apartment Complex located at El Cerrito and Canyon Crest Drives. The project includes the installation <br /> of approximately 4,500 trench feet of conduit, two pad-mounted transformers, one pad-mounted junction <br /> cabinet, two underground structures, and related electrical facilities. <br /> Riverside Public Utilities (RPU) engineering staff performed the design to eliminate any negative visual <br /> impacts to the project and surrounding area, with sensitivity of the existing neighborhood, and within City <br /> Planning guidelines for the designated area of the project. <br /> The project breakdown is proposed as follows: <br /> Project Breakdown <br /> Engineering Performed By: RPU engineering staff <br /> Civil Construction Performed By: Developer at developer's expense <br /> Electrical Work Performed By: RPU field forces <br /> Anticipated Start Date: August 14, 2015 <br /> Anticipated Duration: One year <br /> Coordination Required With: Developer <br /> Reimbursements: 100% reimbursable by developer <br /> FISCAL IMPACT: <br /> The capital expenditure for Work Order No. 1507267 is estimated to be $76,000. Sufficient funds are <br /> available in the Public Utilities' Electrical Capital Account No. 6130000-470601. Consistent with Electric <br /> Rules 10 and 11, the expenditure will be fully reimbursed by the developer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.