Laserfiche WebLink
W A T E R E N f_ P C B I ? I F <br /> Lo RIVERSIDE PUBLIC UTILITIES <br /> • ' . III& Board Memorandum <br /> P U B L I C U T I L I T I E S <br /> BOARD OF PUBLIC UTILITIES DATE: APRIL 2, 2015 <br /> ITEM NO: 5 <br /> SUBJECT: ELECTRICAL DISTRIBUTION FACILITIES INSTALLATION FOR THE BRUNTON <br /> WELL ON GARNER ROAD -WORK ORDER NO. 1510314 <br /> ISSUE: <br /> The issue for Board of Public Utilities consideration is approval of the capital expenditure of $55,000 for <br /> Work Order No. 1510314 for the installation of electrical distribution facilities for the Brunton Well on <br /> Garner Road. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the estimated capital expenditure of $55,000 for Work Order <br /> No. 1510314 for the installation of electrical distribution facilities for the Brunton Well on Garner Road. <br /> BACKGROUND: <br /> The project will extend existing electrical distribution facilities to serve the new Riverside Public Utilities <br /> (RPU) Water Brunton Well. The project includes the installation of approximately 2,500 trench feet of <br /> conduit, one pad-mounted transformer, one pad-mounted junction cabinet, two below ground structures, <br /> two utility poles and related electrical facilities. <br /> Riverside Public Utilities engineering staff performed the design to eliminate any negative visual impacts <br /> to the project and surrounding area, with sensitivity of the existing neighborhood, and within City <br /> Planning guidelines for the designated area of the project. <br /> The project breakdown is proposed as follows: <br /> Project Breakdown <br /> Engineering Performed By: RPU engineering staff <br /> Civil Construction Performed By: RPU Water <br /> Electrical Work Performed By: RPU field forces <br /> Anticipated Start Date: March 30, 2015 <br /> Anticipated Duration: One year <br /> Coordination Required With: RPU Water <br /> Reimbursements: 100% reimbursable by RPU Water <br /> FISCAL IMPACT: <br /> The capital expenditure for Work Order No. 1510314 is estimated to be $55,000. Sufficient funds are <br /> available in the Public Utilities' Electrical Capital Account No. 6130000-470601. Consistent with Electric <br /> Rules 10 and 11, the expenditure will be fully reimbursed by RPU Water. <br />