W t is Li,� r R 9y Lau' i'-: <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: MAY 1, 2015 <br /> ITEM NO: 7 <br /> SUBJECT: CONSTRUCTION OF THE RIVERSIDE AIRPORT WATER MAIN REPLACEMENT <br /> PROJECT—WORK ORDER NO. 1510133 <br /> ISSUE: <br /> The item for Board of Public Utilities consideration is approval of the capital expenditure in the amount of <br /> $826,000 to construct the Riverside Airport Water Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $826,000 for Work Order No. <br /> 1510133, which includes all design, construction, paving, contract administration, inspection and <br /> construction contingency costs for the Riverside Airport Water Main Replacement Project. <br /> BACKGROUND: <br /> The construction of the Riverside Airport Water Main Replacement Project is part of Riverside Public <br /> Utilities' (RPU) on-going water main replacement program to replace old and high priority leaky mains. <br /> The project area consists of existing 4-inch, 6-inch, and 8-inch cast iron water mains that were installed <br /> in the late 1920's, 1950's and early 1960's. The project will involve abandoning approximately 5,800 <br /> linear feet of existing water pipelines located within the Riverside Municipal Airport (RMA) that are in <br /> conflict with recent and planned expansions at RMA. In addition, several existing fire hydrants located <br /> along the taxiway will be relocated to the edge of RMA property to eliminate obstructions. <br /> The work will generally entail the construction of approximately 2,020 linear feet of 12-inch ductile iron <br /> pipe, 14 fire hydrants, 24 service tie-overs, five system connections, along with all necessary fittings and <br /> appurtenances. The work identified will be constructed by the Water Division's field forces. Other than <br /> routine service tie-overs, this project is not expected to disrupt service to RPU water customers. <br /> Once the new water pipelines are installed, RPU will be responsible for standard trench repaving in the <br /> street areas per the Public Works Department (PW) standard. Staff will solicit bids for paving the trench <br /> area from RPU's Paving Contractor Panel. A budgetary estimate for the paving work has been included <br /> in this authorization. <br /> The project breakdown is as follows: <br /> Project Breakdown: <br /> Engineering Performed By: RPU Engineering staff <br /> Construction Performed By: RPU Field Forces <br /> Anticipated Start Date: June 2015 <br /> Anticipated Duration: ■ 3 months <br /> ■ RPU Field Forces <br /> Coordination Required With: ■ Public Works <br /> ■ Riverside Municipal Airport <br /> Reimbursements: None <br />