Laserfiche WebLink
W t is Li,� r R 9y Lau' i'-: <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> BOARD OF PUBLIC UTILITIES DATE: MAY 1, 2015 <br /> ITEM NO: 12 <br /> SUBJECT: CONSTRUCTION OF THE FLOWER STREET WATER MAIN REPLACEMENT <br /> PROJECT—WORK ORDER NO. 1505939 <br /> ISSUE: <br /> The issue for Board of Public Utilities consideration is approval of a capital expenditure in the amount of <br /> $575,500 to construct the Flower Street Water Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $575,500 for Work Order No. <br /> 1505939, which includes all design, construction, paving, contract administration, inspection and <br /> construction contingency costs for the Flower Street Water Main Replacement Project. <br /> BACKGROUND: <br /> The construction of the Flower Street Water Main Replacement Project is part of Riverside Public <br /> Utilities' (RPU) ongoing water main replacement program, intended to replace old and high priority leaky <br /> mains. The project area consists of existing 2-inch and 4-inch steel water mains that were installed <br /> between 1946 and 1953 and have required repairs due to leaks over the past several years. Based on <br /> their leak history and size, these water pipelines have been identified as high priorities for replacement to <br /> increase system reliability and increase fire flow. <br /> The work will generally entail the construction of approximately 1,060 linear feet of 8-inch and 660 linear <br /> feet of 4-inch ductile iron pipe, three fire hydrants, 37 service tie-overs and five system connections, <br /> along with all necessary fittings and appurtenances. The new water facilities will be installed according <br /> to RPU's current standards. <br /> The work identified will be constructed by the Water Division's field forces. Other than routine service tie- <br /> overs, this project is not expected to disrupt service to RPU water customers. <br /> Once the new water pipelines are installed, RPU will be responsible for standard trench repaving per the <br /> Public Works Department (PW) standards. Staff will solicit paving bids for resurfacing the trench area <br /> from RPU's Paving Contractor Panel. A budgetary estimate for the paving work has been included in <br /> this authorization. <br />